Regional Runoff
Obtained a 30 m DEM from PASDA
Used watershed delineator tools to model flow
Notes:
The next step was to develop the regional terrain runoff. I obtained a 30 m DEM and a stream coverage from the Penn. St. spatial data center. I then proceeded to burn in the streams by holding the elevation of the streams constant and adding 2000 ft. to the rest of the DEM. This step is done to ensure flow accumulation in the creeks. I then proceeded through the watershed delineator tools and came up with the following result.