Future Work
Determine actual drainage pipe locations
Determine EPA discharge flows to each creek
Calculate loads of COC’s to each creek
Notes:
In future work, I am going to determine the actual locations of those pipe drains between tank areas so that a more appropriate flow model can be developed. As I previously mentioned, I am going to figure out the NPDES discharge flows, and then eventually come up with some loads for different chemicals of concern to each creek.